home *** CD-ROM | disk | FTP | other *** search
/ PC Electronic Plus / PC Electronics Plus (Most Significant Bits)(1995).ISO / pma / brbld2.gif < prev    next >
Graphics Interchange Format  |  1994-09-08  |  16KB  |  640x480  |  4-bit (8 colors)
Labels: text | electronics | screenshot
OCR: BURGER Rebuilding for Profit A cooling tower can be an untapped profit center for energy conservation and improved production. More often than not, the limiting factor of production is the quality (degree of coldness) of the water used in the production processes. This section illustrates , using real world examples , the before and after conditions of different types of optimized towers. EXAMPLE # 2 - SINGAPORE PETROCHEMICAL PLANT Before After 25,000 IN 4 CELLS GPM 25,000 IN 2 CELLS 38 FT PUMP HEAD 22 FT 105 BRAKE HP 525 90 F CWT 88 F 76 F WBT 76 F HP reduction saves over $60,000 per year, colder water increases production by $2,500 per day. Two cells available for future expansion . $470,000 cost recovered in five months. 1 Continue 2 Previous 0 Main Menu